
New construction and full-depth reconstruction for parking lots, drive aisles, and private access roads.
01 / Service
← View all servicesCommercial asphalt paving is a structural system, not a surface treatment. We build that system from the subgrade up — engineered base, binder course, and surface course — to carry decades of truck traffic, freeze-thaw cycles, and the daily load of an active commercial property.
Our Process
Field measurements, drainage review, soil and base evaluation, and a mix and section spec tuned to the use case — retail vs. industrial vs. municipal.
Sawcut clean joints, remove failed asphalt and unsuitable subgrade, and haul off using our own equipment and trucking.
Proof-roll, compact, and place dense-graded aggregate base to spec thickness with engineered compaction so the system actually performs.
Lay a coarse-graded binder lift for structural strength — the layer most contractors cut to win price.
Place the dense-graded surface lift hot, compact behind the screed in a tight rolling pattern, and tie cleanly into curbs, gutters, and adjacent pavement.
Final striping, ADA layout, signage coordination, and a walk-through with the property contact.
Materials & Equipment
When It's Needed
Problems It Solves
FAQ
A typical 50,000 sq ft parking lot reconstruction runs 1–2 weeks weather permitting. We phase larger lots so the business stays open and traffic stays flowing.
Yes — phased nights/weekends, half-lot rotations, and clear customer traffic plans are standard on our retail and multi-tenant jobs.
Paving rebuilds the structural system from the subgrade up. Overlay places a new wear course over an existing structurally sound base. We'll recommend the right one after a site walk — not before.
A correctly built and maintained commercial lot lasts 20–25 years. The maintenance cycle (seal + crack fill) matters as much as the original install.
Get a Quote
Property managers, GCs, and commercial owners — get a real, walked, written estimate from the crew that will actually do the work.